{"id":1258,"date":"2026-07-17T10:03:05","date_gmt":"2026-07-17T10:03:05","guid":{"rendered":"https:\/\/www.asset-eyes.com\/blog\/?p=1258"},"modified":"2026-07-17T10:06:58","modified_gmt":"2026-07-17T10:06:58","slug":"reshoring-engineering-bottleneck","status":"publish","type":"post","link":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/","title":{"rendered":"Reshoring Is Easy to Announce and Hard to Execute  Here\u2019s the Engineering Bottleneck Nobody\u2019s Talking About"},"content":{"rendered":"\n<p>Open any manufacturing trade publication right now and you\u2019ll find the same story on repeat: another company announcing plans to bring production back to the US. Press releases go out. Executives talk about supply chain resilience. Ground gets broken on new facilities. On paper, reshoring looks like a done deal the moment it\u2019s announced.<\/p>\n\n\n\n<p>But walk the floor of a plant six months after one of these announcements, and the picture often looks very different from the press release. The intent is real. The capital is often real too. So why isn\u2019t the actual output &nbsp; new lines running, new facilities producing &nbsp; showing up on the same timeline as the announcements?<\/p>\n\n\n\n<p><br>The answer sits earlier in the process than most people assume, and it has almost nothing to do with willingness or budget. It sits at the engineering design services stage&nbsp; the unglamorous work of designing and documenting a line before a single machine can run. This article unpacks where reshoring efforts actually stall, why today\u2019s talent market is making that stall worse, and what closes the gap between a reshoring decision and an operational line.<\/p>\n\n\n\n<h2><strong>The Bottleneck Isn\u2019t Capital or Willpower \u2014 It\u2019s Engineering Execution Capacity<\/strong><\/h2>\n\n\n\n<p>Before a new line runs \u2014 before equipment gets ordered, before a contractor breaks ground \u2014 someone has to figure out exactly how that line will work. That means:<\/p>\n\n\n\n<ul><li><strong>Machine and equipment design:<\/strong> new or modified equipment, safety and maintainability built into the design, integration with the rest of the process<\/li><li><strong>Plant and facility layout planning:<\/strong> where the line sits in the building, how material flows through it, how utilities get routed to it<\/li><li><strong>Electrical and controls design:<\/strong> power distribution, control panel design, and how the new equipment integrates with existing systems<\/li><\/ul>\n\n\n\n<p>None of this is optional, and none of it is fast. Without it fully documented, vendors can\u2019t quote accurately, contractors can\u2019t schedule their work, and internal safety and compliance reviews have nothing solid to review.<\/p>\n\n\n\n<p><br>Here\u2019s what typically happens instead: leadership approves the reshoring initiative, and the assumption is that \u201cengineering will figure it out.\u201d But the same engineers who\u2019d need to design and document the new line are usually the ones already keeping the current operation running \u2014 troubleshooting equipment, handling change orders, managing audits. Asking them to stand up a new line on top of that is a bit like asking your one available contractor to build an addition on your house while they\u2019re still patching the roof and unclogging the plumbing elsewhere. Something has to wait, and it\u2019s rarely the plumbing.<\/p>\n\n\n\n<h3><strong>Why This Stage Gets Missed on the Timeline<\/strong><\/h3>\n\n\n\n<p>Part of the problem is that \u201creshoring\u201d sounds simpler from the outside than it is from the inside. Saying \u201cwe\u2019ll duplicate the line we already run overseas\u201d is one sentence. Turning that into a fully engineered, documented solution for a different building, different codes, and different suppliers is a much longer project.<\/p>\n\n\n\n<p>There\u2019s also a visibility problem. You can walk a nearly finished building or point to a machine sitting on a delivery truck \u2014 those milestones are tangible. A finalized layout drawing or a completed controls package doesn\u2019t photograph the same way, so it\u2019s easy for organizations to under-resource the exact stage where the real risk is concentrated.<\/p>\n\n\n\n<h2><strong>The Talent Squeeze Nobody Priced Into the Plan<\/strong><\/h2>\n\n\n\n<p>Even manufacturers who recognize this gap and try to solve it by hiring are running into a labor market that has shifted underneath them. The AI and data center infrastructure boom isn\u2019t a background trend anymore &nbsp; it\u2019s actively pulling from the same talent pool manufacturers need for reshoring.<\/p>\n\n\n\n<p>Data center developers and their build-out contractors are recruiting electricians, <a href=\"https:\/\/www.asset-eyes.com\/hvac-r\" target=\"_blank\" rel=\"noreferrer noopener\">HVAC<\/a> technicians, controls specialists, and project engineers at scale &nbsp; the exact people manufacturers need to electrify new lines, retrofit facilities, and keep uptime intact during the transition. You\u2019re not just competing with the manufacturer down the road for that talent anymore; you\u2019re competing with hyperscale construction budgets that can move faster and pay more.<\/p>\n\n\n\n<p><br>The net effect is that even well-funded, well-intentioned reshoring commitments can sit idle for months \u2014 not because construction is behind schedule, but because the engineering documentation that construction depends on was never finished in the first place.<\/p>\n\n\n\n<h2><strong>What \u201cEngineering Execution\u201d Actually Involves<\/strong><\/h2>\n\n\n\n<p>It\u2019s worth being specific about what this stage actually requires, because the scope is easy to underestimate if you haven\u2019t run through it before. Standing up a reshored line typically means working through several things in parallel:<\/p>\n\n\n\n<ul><li><strong>Facility and plant layout design:<\/strong> positioning equipment, workstations, and material flow paths while accounting for safety clearances, maintenance access, and future flexibility<\/li><li><strong>Machine and equipment design:<\/strong> adapting existing designs or engineering new equipment to fit domestic suppliers, codes, and building constraints<\/li><li><strong>Electrical and controls design:<\/strong> power load planning, <a href=\"https:\/\/www.asset-eyes.com\/blog\/control-panel-design\/\" target=\"_blank\" rel=\"noreferrer noopener\">control panel design<\/a>, and integration with existing systems<\/li><li><strong>Documentation:<\/strong> the drawings, specifications, and bills of materials that let vendors quote accurately and contractors schedule their work<\/li><\/ul>\n\n\n\n<p>Each of these needs dedicated engineering hours, and in a typical reshoring project, they all need to move at roughly the same time to hit any realistic date.<\/p>\n\n\n\n<h3><strong>Why Hiring Your Way Out Rarely Works on Reshoring Timelines<\/strong><\/h3>\n\n\n\n<p>The instinct to solve a capacity problem by hiring is understandable, but the math rarely lines up with reshoring urgency. A realistic hiring cycle for a specialized engineer today runs 60 to 90 days before you factor in onboarding&nbsp; and that clock only starts once a role is approved and posted, assuming the right candidate exists at all in a market where data center projects are also bidding for them.<\/p>\n\n\n\n<p><br>There\u2019s a second mismatch too: reshoring engineering work tends to spike for a defined window \u2014 typically the 12 to 18 months it takes to get a line fully documented and installed \u2014 and then tapers off. Hiring full-time to meet a temporary peak often leaves manufacturers carrying overhead they don\u2019t need once the project is done.<\/p>\n\n\n\n<p>Several industry surveys over the past few years have pointed to a consistent gap between the share of manufacturing leaders who say they intend to reshore and the share of projects that have actually reached full production. That pattern lines up with what shows up on the ground floor: intent and capital are rarely the constraint. Available engineering hours are.<\/p>\n\n\n\n<h2><strong>Closing the Gap Between Decision and Operational Line<\/strong><\/h2>\n\n\n\n<p>This is precisely the phase where flexible, external engineering support can close the distance between a reshoring decision and a reshoring reality. As a machine design company that also delivers engineering design services, Asset-Eyes works with manufacturers at exactly the point where internal teams are stretched thinnest and the clock is already running.<\/p>\n\n\n\n<p><br>That work spans plant and facility layout design, machine design for new or adapted equipment, and electrical control panel design for the lines being stood up &nbsp; not as a checklist of services, but as the connected engineering work that has to happen before anything gets installed. The goal isn\u2019t to replace an internal engineering team; it\u2019s to add capacity at the exact stage where reshoring projects most often lose momentum, without adding a 60-to-90-day hiring cycle to the front of an already time-sensitive commitment.<\/p>\n\n\n\n<p><br>For manufacturers serious about reshoring, the real question isn\u2019t whether the engineering will eventually get done &nbsp; it\u2019s whether it gets done fast enough to protect the timeline that\u2019s already been communicated to customers, investors, and leadership.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"1024\" height=\"432\" src=\"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-1024x432.png\" alt=\"\" class=\"wp-image-1261\" srcset=\"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-1024x432.png 1024w, https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-300x127.png 300w, https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-768x324.png 768w, https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-1536x649.png 1536w, https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_08_19-PM-600x253.png 600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<h2><strong>The Real Reshoring Question<\/strong><\/h2>\n\n\n\n<p>The gap between a reshoring announcement and an operational line rarely comes down to willingness or funding. It comes down to whether there\u2019s enough engineering bandwidth to design the line, plan the layout, engineer the power and controls, and document all of it before construction and installation can even start. Ambition was never the missing piece \u2014 capacity at the engineering stage usually is.<\/p>\n\n\n\n<p>Schedule a discovery call with us today<a href=\"https:\/\/calendly.com\/rajeshraman-asset-eyes?background_color=f0f7fa&amp;primary_color=ee6544\"> <\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"BlogPosting\",\n  \"mainEntityOfPage\": {\n    \"@type\": \"WebPage\",\n    \"@id\": \"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/\"\n  },\n  \"headline\": \"Reshoring Is Easy to Announce and Hard to Execute Here\u2019s the Engineering Bottleneck Nobody\u2019s Talking About\",\n  \"description\": \"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project\",\n  \"image\": \"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM.png\",  \n  \"author\": {\n    \"@type\": \"Organization\",\n    \"name\": \"Asset Eyes\",\n    \"url\": \"https:\/\/www.asset-eyes.com\/blog\/author\/asset-admin\"\n  },  \n  \"publisher\": {\n    \"@type\": \"Organization\",\n    \"name\": \"Asset Eyes\",\n    \"logo\": {\n      \"@type\": \"ImageObject\",\n      \"url\": \"https:\/\/www.asset-eyes.com\/Assets\/Images\/logo.png\"\n    }\n  },\n  \"datePublished\": \"2026-07-17\",\n  \"dateModified\": \"2026-07-17\"\n}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>Open any manufacturing trade publication right now and you\u2019ll find the same story on repeat: another company announcing plans to bring production back to the US. Press releases go out. Executives talk about supply chain resilience. Ground gets broken on new facilities. On paper, reshoring looks like a done deal the moment it\u2019s announced. But<\/p>\n","protected":false},"author":1,"featured_media":1259,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"two_page_speed":[]},"categories":[341],"tags":[338,333,340,284,283,335,339,336,337],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Reshoring Is Easy to Announce, Hard to Execute | Engineering<\/title>\n<meta name=\"description\" content=\"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reshoring Is Easy to Announce, Hard to Execute | Engineering\" \/>\n<meta property=\"og:description\" content=\"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/\" \/>\n<meta property=\"og:site_name\" content=\"Asset-Eyes Infomatics\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-17T10:03:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-17T10:06:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM-1024x691.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"691\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hani Sami Anish\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/#website\",\"url\":\"https:\/\/www.asset-eyes.com\/blog\/\",\"name\":\"Asset-Eyes Infomatics\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.asset-eyes.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM.png\",\"contentUrl\":\"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM.png\",\"width\":1527,\"height\":1030,\"caption\":\"Reshoring\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#webpage\",\"url\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/\",\"name\":\"Reshoring Is Easy to Announce, Hard to Execute | Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#primaryimage\"},\"datePublished\":\"2026-07-17T10:03:05+00:00\",\"dateModified\":\"2026-07-17T10:06:58+00:00\",\"author\":{\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/#\/schema\/person\/bbbb32ea5e3135eac825bc41c1e74d23\"},\"description\":\"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project\",\"breadcrumb\":{\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.asset-eyes.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reshoring Is Easy to Announce and Hard to Execute Here\\u2019s the Engineering Bottleneck Nobody\\u2019s Talking About\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/#\/schema\/person\/bbbb32ea5e3135eac825bc41c1e74d23\",\"name\":\"Hani Sami Anish\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.asset-eyes.com\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5b6027b118cd952a37b12707fc22e915?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5b6027b118cd952a37b12707fc22e915?s=96&d=mm&r=g\",\"caption\":\"Hani Sami Anish\"},\"sameAs\":[\"https:\/\/www.asset-eyes.com\/blog\"],\"url\":\"https:\/\/www.asset-eyes.com\/blog\/author\/asset-admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Reshoring Is Easy to Announce, Hard to Execute | Engineering","description":"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/","og_locale":"en_US","og_type":"article","og_title":"Reshoring Is Easy to Announce, Hard to Execute | Engineering","og_description":"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project","og_url":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/","og_site_name":"Asset-Eyes Infomatics","article_published_time":"2026-07-17T10:03:05+00:00","article_modified_time":"2026-07-17T10:06:58+00:00","og_image":[{"width":1024,"height":691,"url":"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM-1024x691.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hani Sami Anish","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.asset-eyes.com\/blog\/#website","url":"https:\/\/www.asset-eyes.com\/blog\/","name":"Asset-Eyes Infomatics","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.asset-eyes.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM.png","contentUrl":"https:\/\/www.asset-eyes.com\/blog\/wp-content\/uploads\/2026\/07\/ChatGPT-Image-Jul-17-2026-01_06_03-PM.png","width":1527,"height":1030,"caption":"Reshoring"},{"@type":"WebPage","@id":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#webpage","url":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/","name":"Reshoring Is Easy to Announce, Hard to Execute | Engineering","isPartOf":{"@id":"https:\/\/www.asset-eyes.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#primaryimage"},"datePublished":"2026-07-17T10:03:05+00:00","dateModified":"2026-07-17T10:06:58+00:00","author":{"@id":"https:\/\/www.asset-eyes.com\/blog\/#\/schema\/person\/bbbb32ea5e3135eac825bc41c1e74d23"},"description":"Moving production home is only the beginning. Explore the engineering bottlenecks that impact reshoring timelines, costs, and project","breadcrumb":{"@id":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.asset-eyes.com\/blog\/reshoring-engineering-bottleneck\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.asset-eyes.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Reshoring Is Easy to Announce and Hard to Execute Here\u2019s the Engineering Bottleneck Nobody\u2019s Talking About"}]},{"@type":"Person","@id":"https:\/\/www.asset-eyes.com\/blog\/#\/schema\/person\/bbbb32ea5e3135eac825bc41c1e74d23","name":"Hani Sami Anish","image":{"@type":"ImageObject","@id":"https:\/\/www.asset-eyes.com\/blog\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/5b6027b118cd952a37b12707fc22e915?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5b6027b118cd952a37b12707fc22e915?s=96&d=mm&r=g","caption":"Hani Sami Anish"},"sameAs":["https:\/\/www.asset-eyes.com\/blog"],"url":"https:\/\/www.asset-eyes.com\/blog\/author\/asset-admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/posts\/1258"}],"collection":[{"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/comments?post=1258"}],"version-history":[{"count":4,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/posts\/1258\/revisions"}],"predecessor-version":[{"id":1264,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/posts\/1258\/revisions\/1264"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/media\/1259"}],"wp:attachment":[{"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/media?parent=1258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/categories?post=1258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asset-eyes.com\/blog\/wp-json\/wp\/v2\/tags?post=1258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}